How to coordinate the spiral chute ore distributor, spiral groove surface, and ore interception groove?

How to coordinate the spiral chute ore distributor, spiral groove surface, and ore interception groove.

Spiral chutes have a simple structure and a large processing capacity per unit area, and are commonly used for coarse or sweep selection of sand tin, chromite, ilmenite, and other heavy minerals. It does not have a complex transmission, which does not mean that only the slurry needs to be "sent in" on site. The ore distributor determines the amount of each ore, and the spiral groove surface establishes horizontal zoning. The ore cutting groove is responsible for cutting open the formed product zone. If any of the three interfaces becomes unstable, it will be difficult to remedy with additional devices later on.

The ore distributor first ensures that the flow rate of each head is consistent, and the same group of spirals is usually distributed from a total ore box to multiple heads. Inconsistencies in the total tank liquid level, branch pipe length, number of bends, and outlet elevation can all cause flow deviation. The spiral flow film with a large amount of ore becomes thicker, and the light and heavy ore zones are compressed; Spiral with small mineral reserves may also experience discontinuous flow film. During debugging, samples should be taken and weighed one by one, and the concentration should be measured at the same time. It is not enough to rely solely on the size of the water with a meat eye.

chrome spiral concentrator 2

The feed particle size determines whether distinct zones can form on the surface of the spiral chute. A broad range of particle sizes leads to an overlap of size-based and density-based effects; for instance, coarse, low-density particles may migrate toward the inner edge, while fine, high-density particles may be carried toward the outer edge by the water flow. Screening should be employed upstream to limit the maximum particle size; if necessary, the feed should be classified by size, with different fractions directed to separate spiral units. For materials with high clay content, a preliminary washing and desliming step is required-though it is essential to verify that the fine-grained "slimes" do not contain recoverable heavy minerals, as this could lead to metal loss during the desliming process. Spiral chutes operate via a stable flowing film; as the pulp descends along the chute surface, the interplay of centrifugal force, transverse water flow, and particle sedimentation results in the formation of distinct zones. If the feed concentration is too high, inter-particle interference increases; if it is too low, the throughput per unit area of ​​the chute surface becomes insufficient. Furthermore, wear, localized deformation, or the accumulation of a clayey film on the chute surface can disrupt the flowing film. In practice, operators should compare the widths of the mineral zones along the inner and outer edges of each turn and inspect the chute surface after washing to ensure its integrity.

spiral chute

The position of the concentrate cutter is not fixed permanently upon installation; it must be adjusted in accordance with the product streams. Changes in the grade, particle size, or solids concentration of the feed ore will cause the positions of the concentrate and middlings streams to shift. If the cut is too wide, lighter minerals may be entrained in the concentrate; if the cut is too narrow, heavier minerals may end up in the middlings or tailings. When making adjustments, alter only one cutter position at a time, and collect simultaneous samples from the concentrate, middlings, and tailings streams to ensure that any observed changes result from the adjustment of the cutter rather than fluctuations in the feed. For multi-head units, it is also necessary to verify the alignment of the support frame; furthermore, the feed distribution platform, branch pipes, and product launders must provide sufficient space for maintenance. If the support frame is not level, the flow rate variance between individual heads will be amplified, while insufficient slope in the product pipes can lead to solids accumulation and blockages. During the design phase, the liquid level in the feed box, the elevation of the spiral inlets, the slope of the product launders, and the liquid level in the downstream pump sump should all be cross-referenced on a single elevation drawing.

Estimating equipment capacity based on effective sorting conditions provides only a preliminary range. True operational capacity must be determined based on the following prerequisites: uniform flow across all starts, clear separation zones on the trough surface, and the ability to consistently extract the desired product. Only after the project stakeholders provide data on particle size distribution, clay content, dry ore tonnage, pulp density, and heavy mineral content can the appropriate spiral diameter, number of starts, number of units, and the potential need for feed classification be determined.

 